Microtunneling technology

Microtunneling becomes more and more popular as a method of building trenchless collectors in big cities. For several decades microtunneling method is main method used in construction of collectors in Europe, USA and Japan. Important feature of this method is high accuracy of drilling and constant course control. Microtunneling enables laying communications under the most difficult conditions, where all other methods without special measures such as water depression or freezing, are helpless. This method allows laying high-diameter collectors with accuracy of several centimeters.

mt1

Basic scheme of microtunneling technology

Starting and receiving shafts are built on the surface, the distance between them varies between 50 and 1500 m, depth – 8-12 m. Shafts can be round or square with sides up to 6 m depending on microshield type.

Actuating cutting device of microtunnel complex AVN (microshield) effects drilling from the starting shaft in conditions of excessive water pressure in the bottom. Water transmission to the actuating device and pumping of appeared pulp is done by pumps installed on the surface near the starting shaft or near the driving frame inside the shaft. Separate sections of reinforced concrete oк steel lining are also delivered into starting shaft, they are pushed into the ground with jacks, which allows horizontal collector laying. Accuracy of driving of the ground station is corrected by a laser ray. All technological and control functions of microtunneling are computerized. Pulp is delivered by pumps in the mucrotunnel complex separator, where appeared water is re-used and scale, as long as it accumulates, is removed to dump.

Microtunneling by AVN complex is fully automated and is effected under control of operators, who sit in command block of a microtunnel.

mt2

 

mt01 mt02
mt03 mt04
mt05
 

Publications

050413"Началось строительство нефтеотвода "ВСТО-2 – Хабаровский НПЗ" - OilCapital.ru - 30 марта 2013

Раскапывать город для прокладки сетей - вчерашний день"В Сочи ЗАО «ПРиСС» намерено установить шумозащитные экраны вокруг олимпийской стройки" - Кавказзский узел - 21 июля 2012

Раскапывать город для прокладки сетей - вчерашний день"Раскапывать город для прокладки сетей - вчерашний день" - Конкуренция и рынок - № 2(54) июнь 2012

130811"Всегда со щитом" - Комсомольская правда - 12.08.2011

070711"Ещё два коллектора" - Департамент Краснодарского края по реализации полномочий при подготовке зимних Олимпийских игр 2014 года - 07.07.2011

040811 "Под Шексной началось строительство подводного тоннеля, аналогов которому еще не было на Вологотчине" - Красный север - 04.08.2011

828"Риск — благородное дело. Если он экономически и технически оправдан" - Нефть газ промышленность - 8 (28)

лок. версия

280211 "Лидерами не рождаются, ими становятся!. ЗАО «ПРиСС» 15 лет на строительном рынке" - Строй пульс - 28.02.2011

лок. версия

280905"Фонтан у Финляндского" - spb.ru - 28.09.2005

28330 "Новая технология начинает и выигрывает. Микротоннель для инженерных сетей" - Строй Пульс

220508 "Присс" (Петербург) завершило переустройство нефтепродуктопровода "Красный Бор-Морской порт" из-за проекта КАД - Санкт-Петербург гид